02 Compliance

Switchboard and safety switch upgrades

From adding a missing safety switch to a full rewire of an old fuse board, with a durable label and a compliance certificate when it is done.

Price
$320 to $2,400
Typical duration
2 to 6 hours depending on scope

A lot of the corridor's older switchboards, and a surprising number of newer ones, are still running on shared circuits without the safety switch coverage current standards expect. We isolate the supply, upgrade or replace the board, fit RCD safety switches to every circuit that needs one, and relabel the board clearly before we leave. Where a board is at end of life we replace it outright rather than patch around it.

What is included

  • Full assessment of the existing board and its circuit layout
  • Safety switches fitted to every circuit that needs one
  • Full switchboard replacement where the existing board is at end of life
  • Board relabelled clearly once the work is finished
  • Compliance certificate issued the same day
Nathan isolating a switchboard, reaching up into the open cabinet with a screwdriver in hand
The board where every fix at Bremer Line actually starts.
Compliance

$320 to $2,400

adding a safety switch to an existing board sits at the bottom; a full switchboard replacement from an old fuse board to a modern board with RCDs on every circuit sits at the top and is confirmed on site

Book a switchboard assessment

or call 0491 570 159

02How it runs

5 steps, in this order

Typical visit: 2 to 6 hours depending on scope. You are told which step we are on, without having to ask.

  1. 01 Isolate the supply and assess the existing board and circuits
  2. 02 Quote the safety switch addition or the full board replacement in writing
  3. 03 Carry out the upgrade with the supply isolated for the shortest time possible
  4. 04 Test every circuit on the new or upgraded board
  5. 05 Relabel the board and issue the compliance certificate
A hallway with an open white switchboard cabinet door, rows of unmarked circuit breakers inside

03Asked often

Before you book

If your question is not here, it is probably on the FAQ page, and if it is not there either, ring and ask.

How do I know if my switchboard needs upgrading?

The clearest signs are ceramic fuses instead of circuit breakers, no safety switches at all, or a board that has been added to so many times it no longer matches its own labels. We will give you a straight answer on the day, not a sales pitch.

Is a safety switch the same as a circuit breaker?

No. A circuit breaker protects the wiring from overload. A safety switch, or RCD, protects a person from electric shock by cutting power in a fraction of a second if current is leaking somewhere it should not. Most Queensland homes need both, on every circuit.

Do I get anything in writing?

Yes. A compliance certificate for the work performed, issued the same day, along with a clearly relabelled board so the next person who opens it knows what is what.

04Book a visit

Book this service

Most non-urgent bookings are scheduled inside three to five business days. Tell us what is happening and we will confirm a time, or call now if it genuinely cannot wait.

Good to have ready

  • Access to the switchboard, or know where it is if we have not been before
  • A rough idea of when the problem started and what you were doing at the time
  • Anyone else in the house told, if we need to isolate power for part of a visit
  • Photos of the fitting, outlet or damage, if you can get them safely from a distance

Or skip the form

0491 570 159
  • Mon to Fri 6:30am to 4:00pm
  • Sat 7:00am to 11:00am, booked jobs only
  • Sun Closed

The phone forwards to whoever is on call after hours. Anything involving exposed wiring, a burning smell or a tripped main is moved to the front of the queue; everything else gets a call back from 6:30am the next working day.

Book a visit

Tell us roughly what is happening and we will come back to you the same business day. Or call 0491 570 159 and speak to someone now.

or call 0491 570 159

This is a demonstration form. Nothing is sent and nothing is stored.